Kesennuma labor-saving application cases

Public excerpt from an anonymized English summary supplied to the Hoya Botto project on 9 October 2026. The source is Kesennuma_LaborSaving_Cases_EN.docx. This page reproduces selected reported values and limitations. It is a project-prepared excerpt, not a city publication or independent audit.

Application forecasts, not measured results. The source says some projects are still in progress and none has run for a full year. All savings, output and productivity gains below are planned values. The four cases are seafood-related applicants, not necessarily the four projects approved in March. They are not a representative sample of all manufacturing.

Four anonymous projects

Reported total project costs and planned benefits
CaseInvestmentPlanned work reductionPlanned annual labor value
A · Order and shipping paperwork
RPA software, development, dedicated PC and changes to the existing system
¥7.68m540 → 125 minutes/day
76% less process time
1,763 hours/year
¥3.67m/year
B · Larger seaweed processing machine¥22.0m470 → 276 minutes/day
41% less process time
1.7× production capacity
Not stated
C · Washing, sterilization and jar capping¥4.91mWashing: 8 → 1 person-hours/day (88% less)
Capping: 4 → 1 person-hours/day (75% less)
About 2,500 hours/year
¥2.75m/year
D · Seaweed washing¥11.5mThree workers × six hours removed from the washing step
About 3,600 hours/year
¥5.4m/year

Amounts and percentages are rounded as in the supplied summary. Case A assumes 255 working days and Case C 250 days. In Case D, the three workers move to another product line; workers before and after the washer still help load and unload. The stated removal of labor from the washing step does not mean the whole line runs without people or that payroll falls.

Case C forecasts capacity gains but does not include them in its productivity calculation because additional sales are uncertain. Case D forecasts output rising from 1,680 kg to 2,100 kg/day (25%). The summary reports labor-productivity increases of 4% for A, 70% for B and 3.6% for D; C is not calculated.

How application results are defined

The source says post-project verification and reporting procedures are still being checked. Hoya Botto proposes using these definitions when establishing trial baselines; no city endorsement is claimed.

Supplier location does not establish local value retained

Ordering contacts for ¥46.09m total project cost
Supplier locationAmountShare
Has a base in Kesennuma¥36.0m78.1%
Elsewhere in Miyagi¥8.81m19.1%
Outside Miyagi¥1.28m2.8%

This is the location of the supplier providing the quote, not the location of equipment manufacturing, installation work or profit retention. Some local suppliers have headquarters elsewhere and most machine manufacturers are outside the city or prefecture. The source warns that the value actually retained locally is probably much smaller. It provides no confirmed shared-machine or co-development savings examples.

Limits when using the cases

Provenance

Supplied English document, received 9 October 2026. The original is retained privately; this page is a limited anonymized excerpt for the presentation's citations. No public original URL was supplied. Subsidy eligibility and application deadlines are omitted here because they are time-sensitive and outside this excerpt's purpose.